Modular Addition

The Brief & Solution

Our clients’ home in Highett came with a badly built 1970’s extension.  Poor natural light, leaky ceilings and a dated kitchen made them realise that they needed to do something to rectify the situation for their family of four.  After considering a number of options, our clients settled upon a modular extension designed in conjunction with Precon Living builders.

This option meant that the family would only have to manage through minimal disruption during a two week on-site installation, rather than a 3-4 month build.  The modular extension was fabricated in Precon’s Narbethong workshop and installed on site in less than a day.  On site finishes took another two weeks to finalise, including the re-instatement of a pool fence.

The modular extension has provided the family with a light filled, contemporary space to their home, with a minimum of fuss, and disruption.  You can learn more about Precon Living’s modular homes, including extensions here.

The Client

“We couldn’t be happier with the result and the vision detail 9 had for the project was perfect! Thanks Rachel from the bottom of our hearts!” – Amie

Key Features
  • Open plan living
  • Modular extension
  • Contemporary design
  • Ground floor extension
  • Better connectivity between inside and outside
Building Details

 

Municipality Bayside City Council
Year Constructed 2015
Builder Precon Living
Consultants JBG Building Surveyors
Southern Geotechnical
JRL Land Surveyors
Urban Footprint

Want to work together? Call us today.